logo

Get A Quote

HomeNews A Comprehensive Guide to Installing LVT Flooring: Simplifying the Process

A Comprehensive Guide to Installing LVT Flooring: Simplifying the Process

2023-09-19
Remember to carefully read and adhere to the manufacturer's instructions specific to your LVT product. If you encounter any difficulties or uncertainties during the process, consult professionals or seek assistance.

Luxury Vinyl Tile (LVT) flooring has become a popular choice for homeowners due to its durability, versatility, and aesthetic appeal. If you're considering installing LVT flooring in your home, it's important to understand the installation process to ensure a successful outcome. In this comprehensive guide, we will break down the steps involved in installing LVT flooring, providing you with the knowledge and confidence to tackle the project yourself.

 

Step 1: Preparing for Installation


1.1 Measure and Plan: Measure the dimensions of the room and calculate the required amount of LVT flooring, accounting for any additional material needed for cuts and mistakes.


1.2 Evaluate the Subfloor: Inspect the subfloor for any damage, debris, or unevenness. Make necessary repairs and ensure the surface is clean, dry, and level.

 

Step 2: Gathering the Tools and Materials


2.1 Essential Tools: Collect the tools necessary for the installation, including a utility knife, tape measure, chalk line, straightedge, hand roller, notched trowel, and rubber mallet.


2.2 Required Materials: Purchase the LVT flooring of your choice, adhesive or underlayment if needed, and transition strips for doorways or room transitions.

 

Step 3: Installation Process


3.1 Acclimation: Follow the manufacturer's instructions to acclimate the LVT flooring to the room's temperature and humidity, typically for 24-48 hours.


3.2 Starting Point: Begin the installation in a corner of the room, preferably the one visible from the main entrance. Apply adhesive directly to the subfloor or lay down underlayment, depending on the manufacturer's recommendations.


3.3 First Row Placement: Lay the first row of LVT planks or tiles along the starting wall, leaving a small expansion gap. Use a rubber mallet to gently tap them into place.


3.4 Continuing with Subsequent Rows: Lay the subsequent rows, staggering the end joints by at least 6 inches for stability and visual appeal. Trim the last plank in each row if necessary.


3.5 Working Around Obstacles: Measure and cut LVT planks to fit around obstacles such as door frames or vents. Use a jigsaw or utility knife for precise cuts.
3.6 Ensuring Adhesion: After laying each row, apply pressure using a hand roller to ensure proper adhesion and eliminate air bubbles or gaps.


3.7 Installing Transition Strips: Install transition strips at doorways or room transitions to create a seamless transition between LVT flooring and other surfaces.

 

Step 4: Finishing Touches


4.1 Trim and Clean: Remove spacers and trim the expansion gap with baseboards or quarter-round moldings. Thoroughly clean the floor to remove any debris or adhesive residue.


4.2 Allowing Time to Settle: Allow the installed flooring to settle and acclimate to the room for at least 24 hours before subjecting it to heavy foot traffic or placing furniture on it.

 

Conclusion:


By following this comprehensive guide, you can confidently install LVT flooring in your home. Remember to carefully read and adhere to the manufacturer's instructions specific to your LVT product. If you encounter any difficulties or uncertainties during the process, consult professionals or seek assistance. Enjoy the beauty and durability of your newly installed LVT flooring, knowing that you accomplished it with your own hands.

Share
Previous article
Next article